Gold Member Since 2006
Audited Supplier
Ningbo DSW International Co., Ltd.

High Pressure L-CNG Pumps, LNG Immersed Pumps, Industrial Gas Pumps manufacturer / supplier in China, offering Industrial Gas Pumps, CO2 Gas Cylinder From Dsw, Acetylene Gas Cylinder From Dsw and so on.

(/ )

Industrial Gas Pumps

FOB Price: Get Latest Price
Min. Order: 5 Pieces
Production Capacity: 50000PCS/Year
Transport Package: Wooden Carton
Payment Terms: L/C, T/T, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: DWS50-150/165
  • Maximum Exit Pressure: 1.0-35.0MPa
  • Lar Filling Pump: Cryogenic Skid Mounted System
  • Specification: ISO
  • Flow: 500-5000L/H
  • Liquid O2/N/Ar Filling Pump: Lar Gas Filling Pump
  • Trademark: dsw
  • Origin: China
Product Description
Industrial Gas Pumps    
Instruction for installing units         
Industrial gas poumps are mainly used for air separation products:filling of liquid oxygen,liquid nitrogen,liquid argon,liquid carbon dioxide,air supply systems.The units are mainly single row,double row and three-row reciprocating pumps.Refer to each parameter table for specific paraments.                                                                                                                                                                                                                                                           Its flow is 30-5000 L/h and its maximum exit pressure is 35.0MPa.An electromagnetic adjustable speed motor,or a fixed rotating speed motor,or a variable frequency and variable speed motor ,or an explosion proof motor or an explosion proof variable frequency motor can be equipped as per actual requirements.                                                             
Intructions for installing units    
1,The pump inlet shall be close to the storage tank to the greatest extent;    
2,From the pump to the storage tank,the liquid inlet and air return pipeline shall be kept upward sloping to make the air inside the pipeline  return to the storage tank.Reverse "U-shaped"elbows are prohibited in the liquid inlet pipeline,and "U-shaped"elbows are prohibited in the air return pipeline;     
3,Ball valves or brake valves shall be used for the liquid inlet pipeline ande the air return pipeline.Stop valves shall not be used.Elbows shall be reduced to reduce pipeline resistance;    
4,Thermal insulation shall be performed for the liquid inlet pipeline and the air return pipeline;    
5,In order to keep the safety of  the unit or auxiliary pipelines and facilitate operation,a liquid otlet/air outlet pressure interlocking device with automatic control can be equipped;    
6,After the reciprocating pump is operated for 600 hours,the motor dierction can be changed to make the transmssion case rotate in a reversed direction so as to enhance the service life of teh reansmission case.    
Cylinder Filling Pumps Series         
Scope of application          
Such pumps are mainly used for liquid oxygen,liquid nitrogen,liquid argon and liquefied natural gas         
Filling of  all kinds of cylinders with light,medium and high loads         
Filling of  all kinds of storage tanks         
Air supply,air distribution systems         
Main technical parameters         
Flow:50-5000L/h          
Maximum exit pressure:16.5MPa-35.0MPa         
Executive standard         
JB/T 9076 Specifications for Reciprocating Cryogenic Liquid Pumps         
GB/T 9234 Power Reciprocating pumps         
Optional configuration         
Stationary motor/electromagnetic speed regulation/frequency control         
Safety valve/cryogenic stop valve         
Back temperature interlocking device         
Air outlet temperature interlocking device         
Air outlet pressure interlocking device         
Performace features         
A such pump has classic desigen and stable performances[;its service life can reach 20 years         
A high vacuum jacket pump head is used,and the vacuum degree reaches 10-5torr so as to reduce cold loss;         
Its seal is reliable:the service life of packing can each 150,000times/cylinder and the service life of the pistion ring is as long as 300,000 times/cylinder;         
An auxiliary gas sealing device can be equipped to further enhance the service life of  the sealing element;         
Maintenance is convenient:it merely takes two hours to perform a routine maintenance         
The pump can be continuously operated for 24 hours          
          
Table of  Industrial Gas Filling Cylinder Performance Parameters(II)         
Model NO.FLOW Inlet pressureMax Out pressurePowerSize 
L/hMPa(A)MPa(A)KWmm(DN)
   
DWS50-150/165150-1500.02-0.816.54251025
DSW100-250/1651100-2500.02-0.816.54251025
DSW200-350/1651200-3500.02-0.816.54251025
DSW200-450/1651200-4500.02-0.816.55.5251025
DSW300-600/1651300-6000.02-0.816.57.5251025
DSW300-700/1651300-7000.02-0.816.511251025
DSW400-800/1651400-8000.02-0.816.511321525
DSW500-1000/1651500-10000.02-0.816.511321525
DSW600-1200/1651600-12000.02-0.816.515321525
DSW200-450/2501200-4500.02-0.8257.5321525
DSW300-600/2501300-6000.02-0.82511321525
DSW400-800/2501400-8000.02-0.82515321525
DSW200-450/3501200-4500.02-0.83511321525
DSW300-600/3501300-6000.02-0.83515321525
DOUBLE
DSW800-1500/1652800-15000.02-0.816.515401532
DSW1000-2000/16521000-20000.02-0.816.522401532
DSW1000-2500/16521000-25000.02-0.816.530401532
DSW800-1500/2502800-15000.02-0.82522401532
DSW800-2000/2502800-20000.02-0.82530401532
DSW800-1500/3502800-15000.02-0.83537401532
 
DSW1500-3000/16531500-30000.02-0.816.530502040
DSW2000-4000/16532000-40000.02-0.816.537502040
DSW2000-4500/16532000-45000.02-0.816.537502040
DSW2500-5000/16532000-50000.02-0.816.537502040
DSW1500-3000/25031500-30000.02-0.82545502040
DSW2000-4500/25032000-45000.02-0.82575502040
DSW1500-3000/35031500-30000.02-0.83555502040





Inspection and Testing Equipment
 
Transmission case running-in test:
The objective is to make the transmission case sliding bearing pass the run-in period so as to guarantee the steady operation of units.
 
Hydraulic pressure running-in test:
The objective is to perform running-in operation with load to the transmission case; in the meantime, a hydraulic test is performed to the pump head to inspect the pump head leakage and the quality of all weld joints.
 
Transmission case running-in test:
The objective of the delivery test of reciprocating pump unit is to completely assess the all performance indexes of the unit.
 
Centrifugal pump performance test:
The objective of liquid nitrogen cryogenic performance is to assess the all performance indexes of each centrifugalpump unit.
 
Immersed pump performance test:
The objective of liquid nitrogen cryogenic performance is to assess the all performance indexes of each immersed pump unit.
Send your message to this supplier
Avatar
Mrs. Cathy
Sales Manager
*From:
To: Mrs. Cathy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now