• LNG/Lin/Lox Container ASME T75 ISO Stainless Steel Tank for Liquid Gas
  • LNG/Lin/Lox Container ASME T75 ISO Stainless Steel Tank for Liquid Gas
  • LNG/Lin/Lox Container ASME T75 ISO Stainless Steel Tank for Liquid Gas
  • LNG/Lin/Lox Container ASME T75 ISO Stainless Steel Tank for Liquid Gas

LNG/Lin/Lox Container ASME T75 ISO Stainless Steel Tank for Liquid Gas

Material: Steel
Usage: Print
Structure: General Cylinder
Power: Hydraulic
Standard: Standard, Nonstandard
Pressure Direction: Single-acting Cylinder
Samples:
US$ 1/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2006

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
T75 ISO Stainless Steel Tank
Double-Acting Cylinder Type
Common Cylinder
Special Cylinder Type
Number of Cylinders
Combination Cylinder Type
Pressurized Cylinder
Total Volume
20000kg
Dimension
12192×2438×2591 mm
Loading Medium
LNG
Working Pressure
0.7MPa
Transport Package
Packed in Foam
Specification
TPED, EN, ISO9809
Trademark
DSW
Origin
China
HS Code
731100
Production Capacity
60days Per Tank

Product Description

Material: Steel
Use: Industrial Gas
Pressure: High
Brand Name: DSW
LO2,LN2,LAR Cryogenic Tank (Vacuum Powder Heat Insulation) Specifications
.LO2 Cryogenic Tank, LN2 Cryogenic Tank, LAR Cryogenic Tank, 5M3 cryogenic tank, 10M3 cryogenic tank, 15M3 cryogenic tank, 20M3 cryogenic tank, 30M3 cryogenic tank, 5M3 VERTICAL CRYOGENIC LIQUID TANK, 1.6MPa cryogenic tank, CRYOGENIC LIQUID TANK, cryogenic Horizontal tank, Vacuum cryogenic tank, china produce cryogenic tank, liquid cryogenic tank, 20m3 Low Temperature Storage Tank Cryogenic Tank, Liquefied Natural Gas LNG/, 5m3-200m3 Cryogenic tank, LNG Natural Gas Cryogenic Storage Tank,5m3 Horizontal cryogenic tank,5m3 Horizontal cryogenic tank
CO2 gas cylinder
cryogenic tank container, 30m3 cryogenic tank container,15m3 cryogenic tank container
1. Norminal external diameter: 129mm
2. Norminal water capacity: 5-10Liter
.  QUOTATION FOR 20' LCO2 CONTAINER
40Ft/0.7Mpa LNG ISO Tank CONTAINER
1.1 ISO tank container technical spec 

Model:1AA-TCS-40/0.7                                        Insulation type:Multi layer
NO Items Inner vessel Outer vessel
1 Design pressure     MPa 0.7 -0.1(outer)
2 Working pressure    MPa 0.7 -0.1(outer)
3 MAWP            MPa 0.7 /
4 Design temperature    ºC -196 -19~50
5 Working temperature   ºC ≥-162 normal
6 Pneumatic test      MPa 0.9 HLD
7 G. Vol              m3 43 10(interlayer)
8 E. Vol              m3 38.7 /
9 Medium LNG Multi layer
10 Main material SA240M304 Q345R
11 Treatment Pickling and passivation Sanding and coating
12 Corrosion allowance  mm 0 1.0
13 Joint efficiency 1 0.85
14 Filling rate 90% /
15 Static evaporation   %/d ≤0.24(by LIN)
16 Seal off vacuum degree Pa ≤1×10-2
17 Leakage of vacuum interspace  Pam3/s ≤1×10-6
17a Vacuum degree Pa 1×10-2
18 ISO code 42K7
19 Diameter         mm Φ2200 Φ2350
20 External Dimensions  mm 12192×2438×2591
20-a Valve cabinet       mm /
21 type     Horizontal
22 Tare weight           Kg ~12100
23 Fully loading weight    Kg ~18190
24 Design service life 10years
25 Open pressure for safety valve 0.75Mpa
26 Sort III
27 Approval classification  Bureau Veritas
28 Portable tank guideline T75
 

1.2 P&ID

 

.1.3 Storage tank valve list

NO
Name Spec qty Remark
A-1 Lower liquid inlet valve DN80 PN40 1 BESTOBELL
A-2 Upper liquid inlet valve DN50 PN40 1 BESTOBELL
A-3 Supercharger liquid valve DN32 PN40 1 CCK
A-4 Overflow valve DN10 PN40 1 BESTOBELL
A-5 Valve for vacuum gauge tube 1/8" 1 HOKE
A-6 Air valve  DN10 PN40 1 REGO
A-7 Residual liquid discharge valve DN10 PN40 1 REGO
A-8 LG gas phase valve DN6 1 SWAGELOK
A-9 LG balance valve DN6 1 SWAGELOK
A-10 LG liquid phase valve DN6 1 SWAGELOK
A-11 Supercharger gas valve DN50 PN40 1 BESTOBELL
A-12 Vent valve DN50 PN40 1 BESTOBELL
A-13 Three way valve DN25 PN40 1 CCK
A-14 Check valve DN50 PN40 1 BESTOBELL
A-15 Evaporator gas valve DN50 PN40 1 BESTOBELL
YA-1 Safety valve for vessel DN25 PN40 1 Open pressure: 0.75Mpa
YA-2 Safety valve for vessel DN25 PN40 1 Open pressure: 0.75Mpa
YA-3 Safety valve for pipe DN10 PN40 1 Open pressure: 0.8Mpa
YA-4 Safety valve for pipe DN10 PN40 1 Open pressure: 0.8Mpa
YA-5 Safety valve for pipe DN10 PN40 1 Open pressure: 0.8Mpa
X-1 Emergency cut-off valve DN80 PN40 1 CCK /BESTOBELL
X-2 Emergency cut-off valve DN50 PN40 1 CCK /BESTOBELL
X-3 Emergency cut-off valve DN32 PN40 1 CCK /BESTOBELL
X-4 Emergency cut-off valve DN50 PN40 1 CCK /BESTOBELL
FA Back fire relief valve / 1 CCK
CZ-1 Liquid phase connector nozzle DN80 PN40 1 MX
CZ-2 Gas phase connector nozzle DN50 PN40 1 MX
Pi Pressure gauge 0-1.6 1 WIKA
VP-1 Vacuum valve DN50 1 MX
VR-1 Vacuum test part DV6 tube 1 HASTING
Li Level gauge 0-1.5m 1 WIKA
HC Reversing valve K23R8-L10 1 MX
 
About us:
Our company is one of main factory in China Chemical Equipment Group, and as well as the biggest pressure vessel manufacturer in Zhejiang. Sep. Established in 1972 years, We're engaged in design and manufacture pressure vessel for more than 40 years, and have the Design License of Special Equipment (Pressure vessels of type) (RSPZJHG0401-2), It has the following licenses issued by the State Administration of Quality Supervision, Inspection and Quarantine: A1, A2, B3, C2 and C3 pressure vessel manufacturing licenses; the design license for A1, A2, C2 and C3 pressure vessels; and the design license of GC1(3), GC2 and GC3 pressure piping
We have passed ISO9001:2008 International Quality Supervision System Certification.  We own 170000 square meter building size The total assets is 180 million, has 500 workers and staff members, including 55 technician (6 super- engineer, 19 engineer, 10 primary technician, 1 super-technician, 4 technician, 15 Nondestructive Tester (RT, UT). There're 8 departments, such as technology, production, sales, quality, purchase, finance, secretary and standard, 1general management office, 1 international export office (Ningbo DSW), 5 workshops and 1 Installation Company. Set up the Welding Test station with Ningbo Bureau of Quality and Technical Supervision. Quality Guarantee System charged by quality engineer, design engineer, welding.

LNG/Lin/Lox Container ASME T75 ISO Stainless Steel Tank for Liquid Gas
LNG/Lin/Lox Container ASME T75 ISO Stainless Steel Tank for Liquid Gas
LNG/Lin/Lox Container ASME T75 ISO Stainless Steel Tank for Liquid Gas


Inspection guarantee:

The relevant welding seams will be subject to 100% RT non-destructive testing and penetrant testing (PT) according to the technological requirements of storage tank production. High-purity nitrogen (up to 99.999%) will be used to conduct the strength testing. Finally, advanced helium mass spectrometer leak detectors (with precision up to 2×10-9Pa.L/s) will be used to conduct Helium mass spectrometer leak detection. The inner containers of the storage tanks will be passivated by overall pickling to meet the cleanliness requirements for dangerous goods. Imported ultraviolet black light lamps will be used to make sure that there is no oil stain and other organic impurities in the inner containers. The inner and outer containers, after cleaning, will be assembled at a time interval less than 2.5 hours. After assembling, the inner containers and interlayers will be filled with nitrogen to protect them from dust and organic impurities, so as to ensure the cleanliness. The inner and outer surfaces of the outer containers will be subject to overall sandblasting treatment to meet the requirements of Sa-2.5 standard. When the surfaces of steel plates show the metallic color, a vacuum cleaner will be used to suck off the dust adhered to the surface so as to further ensure the vacuum degree in the interlayer. Special high-quality perlite is used as the insulation material in the interlayer. The perlite will be treated by using our company's special process before being in the interlayer. All the internal cylinders, after manufactured, will be subject to the gas-tight and pressure performance tests. Both the internal and outer cylinders will be subject to rigorous Helium mass spectrum leak detection. After the production is completed, all the pipe openings will be opened to carry out nitrogen purging and replacement, so as to meet the oxygen usage standard. After this, all the pipelines and valves will be sealed and the tanks will be filled with 0.2MPa high-purity nitrogen for protecting the tanks.


LNG/Lin/Lox Container ASME T75 ISO Stainless Steel Tank for Liquid Gas
LNG/Lin/Lox Container ASME T75 ISO Stainless Steel Tank for Liquid Gas
LNG/Lin/Lox Container ASME T75 ISO Stainless Steel Tank for Liquid Gas
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now