20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank

Product Details
Customization: Available
Material: Steel
Usage: Print

360° Virtual Tour

Diamond Member Since 2006

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
23
Year of Establishment
2004-01-09
  • 20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank
  • 20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank
  • 20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank
  • 20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank
  • 20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank
  • 20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank
Find Similar Products

Basic Info.

Structure
General Cylinder
Power
Hydraulic
Standard
Standard, Nonstandard
Pressure Direction
Single-acting Cylinder
Double-Acting Cylinder Type
Common Cylinder
Special Cylinder Type
Number of Cylinders
Combination Cylinder Type
Pressurized Cylinder
Volume
20m3
Geometric Volume
06cr19ni10
Working Pressure
16bar
Transport Package
Standard Export Pack
Specification
TPED, EN, ISO9809
Trademark
DSW
Origin
China
HS Code
731100
Production Capacity
500PCS Per Day

Product Description


cryogenic tanks for transportation for road and ,railway and sea. Cryogenic vessels are tanks designed to store materials at temperatures below -150ï½° Fahrenheit. They can be used to safely store a variety of products, including oxygen, argon, nitrogen, helium, and natural gas. Cryogenic pressure vessels can be made out of quality stainless steel or carbon shells. These cryogenic vessels can be made with single, double, or triple wall to provide the best insulation for your specific requirements. Available in low and high pressure models, cryogenic vessels are easy to operate and can be built to almost any capacity. The cryogenic vessels feature automated pressure-building circuitry and standard safety and control equipment. Cryogenic vessels are built with liquid level indicators so you know exactly how much is stored inside your vessel while vacuum and pressure gauges provide constant monitoring of conditions inside of your tank. Release valves and other safety equipment help to ensure that the cryogenic vessels operate in accordance with safety standards. We can manufacture both horizontal and vertical cryogenic tanks to meet the needs of all workplaces.

Model

Storage Medium

Effective Volume

Max Working Pressure

Tank Weight

Boundary Dimension

DSW-5/0.8

LO2,LN2,LAr,LNG

5M3

0.8MPa

4375kgs

1916mm*5141mm

DSW-5/1.6

LO2,LN2,LAr,LNG

5M3

1.6MPa

4950kgs

1916mm*5141mm

DSW-10/0.8

LO2,LN2,LAr,LNG

10M3

0.8MPa

6930kgs

2520mm*5461mm

DSW-10/1.6

LO2,LN2,LAr,LNG

10M3

1.6MPa

8000kgs

2520mm*5461mm

DSW-5/2.16

LCO2

5M3

2.16MPa

5469kgs

1919mm*5065mm

DSW-10/2.16

LCO2

10M3

2.16MPa

9015kgs

2520mm*5361mm

About us:
Our company is one of main factory in China Chemical Equipment Group, and as well as the biggest pressure vessel manufacturer in Zhejiang. Sep. Established in 1972 years, We're engaged in design and manufacture pressure vessel for more than 40 years, and have the Design License of Special Equipment (Pressure vessels of type) (RSPZJHG0401-2), It has the following licenses issued by the State Administration of Quality Supervision, Inspection and Quarantine: A1, A2, B3, C2 and C3 pressure vessel manufacturing licenses; the design license for A1, A2, C2 and C3 pressure vessels; and the design license of GC1(3), GC2 and GC3 pressure piping
We have passed ISO9001:2008 International Quality Supervision System Certification.  We own 170000 square meter building size The total assets is 180 million, has 500 workers and staff members, including 55 technician (6 super- engineer, 19 engineer, 10 primary technician, 1 super-technician, 4 technician, 15 Nondestructive Tester (RT, UT). There're 8 departments, such as technology, production, sales, quality, purchase, finance, secretary and standard, 1general management office, 1 international export office (Ningbo DSW), 5 workshops and 1 Installation Company. Set up the Welding Test station with Ningbo Bureau of Quality and Technical Supervision. Quality Guarantee System charged by quality engineer, design engineer, welding.

20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank
20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank
20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank


Inspection guarantee:

The relevant welding seams will be subject to 100% RT non-destructive testing and penetrant testing (PT) according to the technological requirements of storage tank production. High-purity nitrogen (up to 99.999%) will be used to conduct the strength testing. Finally, advanced helium mass spectrometer leak detectors (with precision up to 2×10-9Pa.L/s) will be used to conduct Helium mass spectrometer leak detection. The inner containers of the storage tanks will be passivated by overall pickling to meet the cleanliness requirements for dangerous goods. Imported ultraviolet black light lamps will be used to make sure that there is no oil stain and other organic impurities in the inner containers. The inner and outer containers, after cleaning, will be assembled at a time interval less than 2.5 hours. After assembling, the inner containers and interlayers will be filled with nitrogen to protect them from dust and organic impurities, so as to ensure the cleanliness. The inner and outer surfaces of the outer containers will be subject to overall sandblasting treatment to meet the requirements of Sa-2.5 standard. When the surfaces of steel plates show the metallic color, a vacuum cleaner will be used to suck off the dust adhered to the surface so as to further ensure the vacuum degree in the interlayer. Special high-quality perlite is used as the insulation material in the interlayer. The perlite will be treated by using our company's special process before being in the interlayer. All the internal cylinders, after manufactured, will be subject to the gas-tight and pressure performance tests. Both the internal and outer cylinders will be subject to rigorous Helium mass spectrum leak detection. After the production is completed, all the pipe openings will be opened to carry out nitrogen purging and replacement, so as to meet the oxygen usage standard. After this, all the pipelines and valves will be sealed and the tanks will be filled with 0.2MPa high-purity nitrogen for protecting the tanks.


20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank
20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank
20m3 30m3 60m3 0.8MPa 1.2MPa Cryogenic Storage Tank
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier