Cryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling Station

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1year

360° Virtual Tour

Diamond Member Since 2006

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
23
Year of Establishment
2004-01-09
  • Cryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling Station
  • Cryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling Station
  • Cryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling Station
  • Cryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling Station
  • Cryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling Station
  • Cryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling Station
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
Overview

Basic Info.

Model NO.
Cryogenic LNG LCNG Refueling Station
Certification
ISO9001: 2000, GB Standard
No. of Gas Hose
Two
Operation Mode
Self-help
Applicable Car Model
LNG Lcng
Name
LNG Lcng Gasoline Station
Volume
100-6000m3/H
Machine
Tank, Pump and Vaporizer Skid
Delivery Time
90-120days
Transport Package
Container
Specification
LNG LCNG pump, tank, vaporizer
Trademark
DSW
Origin
China
HS Code
841381
Production Capacity
5000set/Year

Product Description

LNG LCNG Gasoline  Refuelling Station
 
Product Description

LNG truck filling station mainly consists of LNG tank, LNG storage tank, unloading/pressure regulating supercharger, LNG cryogenic pump, gas filling machine and LNG vehicle system, etc. LNG truck filling station is generally conventional station and skid loading station

The above two kinds of LNG filling stations are basically the same in terms of the main equipment composition, the difference is :LNG filling machine, booster pump pry and other equipment is integrated on the pry body. The skid-mounted LNG filling station equipment has a small amount of on-site construction and a short installation and commissioning period, which is suitable for LNG filling stations with small scale and low site requirements: The fixed LNG filling station has a large amount of on-site construction and a relatively long period, which is suitable for large-scale LNG filling stations.
Detailed Photos

Cryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling StationCryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling StationCryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling StationCryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling Station

Product Parameters

The process flow of LNG truck filling station is divided into four steps: unloading process, pressure regulation process, gas filling process and pressure relief process

1.The gas filling process refers to the process that the LNG in the LNG storage tank is pressurized by the submersible pump, and then fed by the gas filling machine to the LNG vehicle after measurement. Before filling the car with gas, the car storage cylinder must be decompressed first, and the gas generated in the bottle can be recovered through the return gas pipeline on the filling machine to reduce the pressure of the storage cylinder.
2.The pressure relief process refers to that during the operation of the filling station, the pressure of the storage tank, pipeline and submersible pump pool increases with the generation of LNG vaporization BOG, and the low-temperature gas or discharged liquid released from the LNG storage tank and pipeline is released to the atmosphere through the release system to ensure the safety of the storage tank. However, the direct release into the atmosphere not only causes a waste of resources, but also increases the hidden danger.
The standby process is that the LNG liquid enters the LNG pump sled from the storage tank, and then returns to the LNG storage tank through the pipeline to avoid the phenomenon of stratified boiling in the LNG storage tank.
The temperature and pressure regulation process refers to the pressurization process and temperature increase process of the storage tank, and the pressurization device is used to pressurize the LNG in the storage tank. Because the liquid in the storage tank of LNG vehicles is saturated liquid, it is necessary to adjust the pressure of the storage tank to make the LNG become saturated liquid, and then gas the car.
 
item name type quantity
LNG dispenser pump skid
1 LNG dispenser pump BP-80 2pcs
2 cryogenic valve   1suit
3 Low temperature instrument   1suit
4 Low temperature pipes   1suit
5 Low temperature elbow and low temperature tee   1suit
6 the relief pipe system. Including skid-inside scattered cryogenic pipelines and accessories 1suit
7 Unloading supercharger /Tank supercharger 300NM3/h,1.6MPa 1suit
8 EAG heater 75NM3/h,1.6MPa 1suit
9 skid-inside cable, explosion-proof junction box and explosion-proof lighting   1suit
10 skid the base frame With the tent 1suit
11 Cryogenic damper   2suit
12 LNG dispenser pump skid tent   1suit
13 LNG dispenser pump skid Including electrostatic bonding, painting, pressure testing and skid 1suit
14  Unloading hose DN32 1pcs
15  Unloading hose DN40 1pcs
16  Unloading hose DN50 1pcs
17 LNG dispenser pump skid Frequency conversion control system   1suit
Cryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling StationCryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling StationCryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling StationCryogenic LNG Pumps Vaporizer Skid LNG Lcng Refueling Station

 














 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier