20FT ISO Tank for LNG/Lox/Lin/Lar

Product Details
Customization: Available
After-sales Service: 1year
Warranty: 1year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2006

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
23
Year of Establishment
2004-01-09
  • 20FT ISO Tank for LNG/Lox/Lin/Lar
  • 20FT ISO Tank for LNG/Lox/Lin/Lar
  • 20FT ISO Tank for LNG/Lox/Lin/Lar
  • 20FT ISO Tank for LNG/Lox/Lin/Lar
  • 20FT ISO Tank for LNG/Lox/Lin/Lar
  • 20FT ISO Tank for LNG/Lox/Lin/Lar
Find Similar Products

Basic Info.

Model NO.
20FT ISO Tank for LNG/Lox/Lin/Lar
Function
Storage Pressure Vessel
Application
Liquid
Material
Carbon Steel
Pressure
0.1MPa≤p<1.6MPa
Storage Medium
Lo2/Ln2/Lar/Lco2
Pressure Level
Low Pressure (0.1MPa≤p<1.6MPa)
Condition
New
Name
20FT T75 Un Portable ISO Tank
Transport Package
Container
Specification
20M3
Trademark
DSW
Origin
China
HS Code
731100
Production Capacity
100000 Per Year

Packaging & Delivery

Package Size
6058.00cm * 2438.00cm * 2591.00cm
Package Gross Weight
9100.000kg

Product Description

20FT T75 UN Portable ISO Tank for  LO2/LN2/LAR/LCO2/LNG
 
T75 UN Portable Tank 
- Medium : LO2/LN2/LAR/LCO2/LNG
- Color: white
- Capacity: 20.8 M3
- Design pressure: 2.2 MPa
- Working pressure: 2.2 Mpa
- Working temperature: min -196 o C / Max : 50 o C
- Dimension: 6058 X 2438 X 2591 mm
- Safe valve /Herose ; Flowmetter/Wika;
Different valves /Baitu
- Material:
+ Inner vessel: SA-240M304
+ Outer jacket: Q.345R
- Net weight: 9,100kg
- Vacuum pressure rate < 0.05 torr
- Production standard : ASME standard


20FT ISO Tank for LNG/Lox/Lin/Lar
20FT ISO Tank for LNG/Lox/Lin/Lar20FT ISO Tank for LNG/Lox/Lin/Lar20FT ISO Tank for LNG/Lox/Lin/Lar20FT ISO Tank for LNG/Lox/Lin/Lar
About us:
Our company is one of main factory in China Chemical Equipment Group, and as well as the biggest pressure vessel manufacturer in Zhejiang. Sep. Established in 1972 years, We're engaged in design and manufacture pressure vessel for more than 40 years, and have the Design License of Special Equipment (Pressure vessels of type , , ) (RSPZJHG0401-2), It has the following licenses issued by the State Administration of Quality Supervision, Inspection and Quarantine: A1, A2, B3, C2 and C3 pressure vessel manufacturing licenses; the design license for A1, A2, C2 and C3 pressure vessels; and the design license of GC1(3), GC2 and GC3 pressure piping
We have passed ISO9001:2008 International Quality Supervision System Certification.  We own 170000 square meter building size The total assets is 180 million, has 500 workers and staff members, including 55 technician (6 super- engineer, 19 engineer, 10 primary technician, 1 super-technician, 4 technician, 15 Nondestructive Tester (RT, UT). There're 8 departments, such as technology, production, sales, quality, purchase, finance, secretary and standard, 1general management office, 1 international export office (Ningbo DSW), 5 workshops and 1 Installation Company. Set up the Welding Test station with Ningbo Bureau of Quality and Technical Supervision. Quality Guarantee System charged by quality engineer, design engineer, welding.


20FT ISO Tank for LNG/Lox/Lin/Lar
Inspection guarantee:

The relevant welding seams will be subject to 100% RT non-destructive testing and penetrant testing (PT) according to the technological requirements of storage tank production. High-purity nitrogen (up to 99.999%) will be used to conduct the strength testing. Finally, advanced helium mass spectrometer leak detectors (with precision up to 2×10-9Pa.L/s) will be used to conduct Helium mass spectrometer leak detection. The inner containers of the storage tanks will be passivated by overall pickling to meet the cleanliness requirements for dangerous goods. Imported ultraviolet black light lamps will be used to make sure that there is no oil stain and other organic impurities in the inner containers. The inner and outer containers, after cleaning, will be assembled at a time interval less than 2.5 hours. After assembling, the inner containers and interlayers will be filled with nitrogen to protect them from dust and organic impurities, so as to ensure the cleanliness. The inner and outer surfaces of the outer containers will be subject to overall sandblasting treatment to meet the requirements of Sa-2.5 standard. When the surfaces of steel plates show the metallic color, a vacuum cleaner will be used to suck off the dust adhered to the surface so as to further ensure the vacuum degree in the interlayer. Special high-quality perlite is used as the insulation material in the interlayer. The perlite will be treated by using our company's special process before being in the interlayer. All the internal cylinders, after manufactured, will be subject to the gas-tight and pressure performance tests. Both the internal and outer cylinders will be subject to rigorous Helium mass spectrum leak detection. After the production is completed, all the pipe openings will be opened to carry out nitrogen purging and replacement, so as to meet the oxygen usage standard. After this, all the pipelines and valves will be sealed and the tanks will be filled with 0.2MPa high-purity nitrogen for protecting the tanks.
20FT ISO Tank for LNG/Lox/Lin/Lar





 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier